|
No. |
Title |
Date |
|
101 |
Seasonal Variations of Manning's Roughness Coefficient in a Subtropical Marsh |
1982 |
|
102 |
Patterns of Radiophosphorus Accumulation in the Everglades After its Introduction into Surface Water |
1982-02 |
|
103 |
An analysis of water supply backpumping for the lower east coast planning area |
1982-02 |
|
104 |
Lake Okeechobee water quality, April 1980-March 1981 : technical memorandum |
1982-03 |
|
105 |
Consumptive use and supplemental water requirements of crops grown in the Everglades agricultural area |
1982-04 |
|
106 |
Long Term Tropical Storm Incidence, |
1982-04 |
|
107 |
Preliminary Report on Rainstorm of March 28-29, 1982 |
1982-04 |
|
108 |
Preliminary Report on Rainstorm of April 23-26, 1982. |
1982-05 |
|
109 |
Water quality characteristics of the lower Kissimmee River Basin, Florida |
1982-05 |
|
110 |
Report on Tropical Storm Dennis August 16 - 18, 1981 |
1982-06 |
|
111 |
A Survey of Water Quality Characteristics and Chlorophyll a Concentrations in the Caloosahatchee River System, Florida: Final Report |
1982-07 |
|
112 |
Geophysical signature of Pliocene reef limestones using direct current and electromagnetic resistivity survey methods, Collier County, Florida |
1982-07 |
|
113 |
Application of DC resistivity surveys to regional hydrogeologic investigations, Collier County, Florida |
1982-09 |
|
114 |
Performance of District Structures During Critical Storm Events in West Miami, and Proposed Alternatives to Reduce Flooding |
1982-10 |
|
115 |
Taylor Creek Headwaters Project: Phase I Report, Water Quality |
1982-10 |
|
116 |
Southwest Broward County study. |
1982-10 |
|
117 |
Upland Detention/Retention Demonstration Project; Fourth Annual Report to the Coordinating Council on the Restoration of the Kissimmee River Valley and Taylor Creek/Nubbin Slough Basin |
1982-12 |
|
118 |
Lake Okeechobee water quality, April 1981-March 1982 : technical memorandum |
1983-01 |
|
119 |
Upper East Coast Water Quality Studies |
1983-01 |
|
120 |
Report to the United States Army Corps of Engineers Requesting a Review of Central and Southern Florida Flood Control Project Facilities in the C-111 Basin, Dade County, Florida. |
1983-02 |
|
|