|
|
|
Flow Rating Analysis for Pump Stations S-382 and S-383 Ten Mile Creek Water Preserve Area |
|
|
Flow Rating Analysis for Pump Stations S-382 and S-383 Ten Mile Creek Water Preserve Area |
|
|
Flow Rating Analysis for Pump Stations S-385 Nubbin Slough / New Palm Stormwater Treatment Area |
|
|
Flow Rating Analysis for Pump Stations S-385 Nubbin Slough / New Palm Stormwater Treatment Area |
|
|
|
Impacts of past climate and sea level change on Everglades wetlands |
|
|
Impacts of past climate and sea level change on Everglades wetlands |
|
|
Investigation of Surface Water-Groundwater Interactions at S-7 Pump Station |
|
|
Investigation of Surface Water-Groundwater Interactions at S-7 Pump Station |
|
|
|
Natural Systems: South Florida Regional Planning Council, March 1978 |
|
|
Natural Systems: South Florida Regional Planning Council, March 1978 |
|
|
Papers relating to the Miami Mineral, Oil and Gas Company and Tamiami Trail |
|
|
Papers relating to the Miami Mineral, Oil and Gas Company and Tamiami Trail |
|
|
|
Periphyton and water quality relationships in the Everglades water conservation areas, 1978-1982 |
|
|
Periphyton and water quality relationships in the Everglades water conservation areas, 1978-1982 |
|
|
Potential Ecological Consequences of Climate Change in South florida and the Everglades |
|
|
Potential Ecological Consequences of Climate Change in South florida and the Everglades |
|
|
|
Preliminary analysis of a field-scale herbicide application of Aquathol K to control Hydrilla verticillata in Stormwater Treatment Area 2, Cell 3 |
|
|
Preliminary analysis of a field-scale herbicide application of Aquathol K to control Hydrilla verticillata in Stormwater Treatment Area 2, Cell 3 |
|
|
Preliminary Environmental Responses to Marsh Dewatering and Reduction in Water Regulation Schedule in Water Conservation area-2A, November 1, 1980-December 31, 1981 |
|
|
Preliminary Environmental Responses to Marsh Dewatering and Reduction in Water Regulation Schedule in Water Conservation area-2A, November 1, 1980-December 31, 1981 |
|
|
|
Proposed final boundary, Everglades National Park, Florida |
|
|
Proposed final boundary, Everglades National Park, Florida |
|
|
Rating Analyses for Pump Statons (S140, S331, S6, S7, S8) |
|
|
Rating Analyses for Pump Statons (S140, S331, S6, S7, S8) |
|
|
|
Rating Development for Flow Through Culverts Under SR 9336 in the Everglades National Park III: Final Report |
|
|
Rating Development for Flow Through Culverts Under SR 9336 in the Everglades National Park III: Final Report |
|
|
Rating Development for Flow Through Culverts Under SR9336 in the Everglades National Park I: Concepts and Methods |
|
|
Rating Development for Flow Through Culverts Under SR9336 in the Everglades National Park I: Concepts and Methods |
|
|
|
Rating Development for Flow Through Culverts Under SR9336 in the Everglades National Park II: Rating Calibration |
|
|
Rating Development for Flow Through Culverts Under SR9336 in the Everglades National Park II: Rating Calibration |
|
|
Report of Everglades Engineering Board of Review to Board of Commissioners of Everglades Drainage District |
|
|
Report of Everglades Engineering Board of Review to Board of Commissioners of Everglades Drainage District |
|
|
|
Report of the special study team on the Florida Everglades George W. Cornwell ... [et al.]. |
|
|
Report of the special study team on the Florida Everglades George W. Cornwell ... [et al.]. |
|
|
Status of the Eastern Indigo Snake in Southern Florida National Parks and Vicinity |
|
|
Status of the Eastern Indigo Snake in Southern Florida National Parks and Vicinity |
|
|
|
Summary of fires in Everglades National Park and Big Cypress National Preserve, 1977-1978 |
|
|
Summary of fires in Everglades National Park and Big Cypress National Preserve, 1977-1978 |
|
|
Supplemental Water Use in the Everglades Agricultural Area |
|
|
Supplemental Water Use in the Everglades Agricultural Area |
|