No. Title Date
101 Toucan Talk: Vol. 22, No. 4 July-August 1996 1996
102 Draft: Evaluation of Benefits and Impacts of the Hydropattern Restoration Components of the Everglades Construction Project 1996-08-16
103 Effects of Hurricane Andrew on Natural and Archeological Resources 1996-09
104 Vegetation of Shark Slough, Everglades National Park 1997-04
105 Investigation of Surface Water-Groundwater Interactions at S-7 Pump Station 2002-02
106 Miami River Corridor Urban Infill Plan 2002-09
107 2000-2001 Drought Report in South Florida 2002
108 Cold war in South Florida : Historic resource study 2004-10
109 Everglades Water Quality 2005
110 As Assessment of the Interim Operational Plan 2005
111 Rating Development for Flow Through Culverts Under SR9336 in the Everglades National Park I: Concepts and Methods 2005-04
112 Rating Development for Flow Through Culverts Under SR9336 in the Everglades National Park II: Rating Calibration 2005-04
113 Preliminary analysis of a field-scale herbicide application of Aquathol K to control Hydrilla verticillata in Stormwater Treatment Area 2, Cell 3 2005-07
114 Rating Development for Flow Through Culverts Under SR 9336 in the Everglades National Park III: Final Report 2006-01
115 Rating Analyses for Pump Statons (S140, S331, S6, S7, S8) 2006-02
116 Flow Rating Analysis for Pump Stations S-382 and S-383 Ten Mile Creek Water Preserve Area 2006-10
117 Flow Rating Analysis for Pump Stations S-385 Nubbin Slough / New Palm Stormwater Treatment Area 2006-12
118 Assessing the Conservation Efficacy of the Dry Tortugas National Park Research Natural Area 2007
119 Numerical Model Development to Address the Effects of Climate Change on Coastal Hydrology and Ecology in Souther Florida 2008-08-01
120 Sea Level Rise in Miami-Dade County, Florida 2009