41
Description of water supply facilities of the Miami-Dade Water and Sewer Authority
42
East Everglades ground water quality monitoring study : 1985-1986
43
East Everglades resources planning project : Base and alternate scenarios
44
East Everglades resources planning project : Residential land uses
45
Economics of surface water runoff storage in brackish aquifers in south Florida
46
Effect of urban stormwater runoff to a man-made lake on groundwater quality
47
Effects of Sea Level Rise and Other Climate Change Impacts on Southeast Florida's Water Resources
48
Environmental responses to the Kissimmee River Demonstration Project
49
Environmental studies in the Chandler Slough watershed
50
Evaluation of the water management system at a single family residential site.
51
Evaluation of the water management system at a single family residential site.
52
Everglades National Park water supply, letter report on canal 123 (Miami Canal) Department of the Army, Jacksonville District, Corps of Engineers.
53
Everglades Water Quality
54
Field investigation into the feasibility of storing fresh water in saline portions of the Floridan aquifer system, St. Lucie County, Florida
55
Florida sugar farmers : Proud partners in the Everglades restoration
56
Floridan Aquifer system test well program at Lake Lytal Park, West Palm Beach, Florida
57
Flow Rating Analysis for Pump Stations S-382 and S-383 Ten Mile Creek Water Preserve Area
58
Flow Rating Analysis for Pump Stations S-385 Nubbin Slough / New Palm Stormwater Treatment Area
59
Ground water resource assessment of Eastern Palm Beach County, Florida
60
Groundwater-surface water interaction along the C-2 Canal, Miami-Dade County, Florida