21
Flow Rating Analysis for Pump Stations S-382 and S-383 Ten Mile Creek Water Preserve Area
22
Flow Rating Analysis for Pump Stations S-385 Nubbin Slough / New Palm Stormwater Treatment Area
23
Impacts of past climate and sea level change on Everglades wetlands
24
Investigation of Surface Water-Groundwater Interactions at S-7 Pump Station
25
Natural Systems: South Florida Regional Planning Council, March 1978
26
Papers relating to the Miami Mineral, Oil and Gas Company and Tamiami Trail
27
Periphyton and water quality relationships in the Everglades water conservation areas, 1978-1982
28
Potential Ecological Consequences of Climate Change in South florida and the Everglades
29
Preliminary analysis of a field-scale herbicide application of Aquathol K to control Hydrilla verticillata in Stormwater Treatment Area 2, Cell 3
30
Preliminary Environmental Responses to Marsh Dewatering and Reduction in Water Regulation Schedule in Water Conservation area-2A, November 1, 1980-December 31, 1981
31
Proposed final boundary, Everglades National Park, Florida
32
Rating Analyses for Pump Statons (S140, S331, S6, S7, S8)
33
Rating Development for Flow Through Culverts Under SR 9336 in the Everglades National Park III: Final Report
34
Rating Development for Flow Through Culverts Under SR9336 in the Everglades National Park I: Concepts and Methods
35
Rating Development for Flow Through Culverts Under SR9336 in the Everglades National Park II: Rating Calibration
36
Report of Everglades Engineering Board of Review to Board of Commissioners of Everglades Drainage District
37
Report of the special study team on the Florida Everglades George W. Cornwell ... [et al.].
38
Status of the Eastern Indigo Snake in Southern Florida National Parks and Vicinity
39
Summary of fires in Everglades National Park and Big Cypress National Preserve, 1977-1978
40
Supplemental Water Use in the Everglades Agricultural Area