4181
A team of workers constructing the frame of the South outbuilding behind the Peso de Burgo House, looking Northeast, 1973
4182
A team of workers constructing the frame of the South outbuilding behind the Peso de Burgo House, looking West, 1973
4183
Cladding the Southern gable side of the Peso de Burgo House, looking West, 1973
4184
Framing the North outbuilding behind the Peso de Burgo, looking Northwest, 1973
4185
The Gallegos House at the intersection of St. George Street and Cuna Street, looking Southeast, 1973
4186
Views of the Joaneda House just prior to restoration work, 1973
4187
Deconstruction of the Joaneda House in preparation for restoration work
4188
Views showing first floor ceiling beams prior to the roof reconstruction
4189
Details of door lintels
4190
Lumber being hand hewn on site for use in Joaneda House restoration work
4191
Reconstructing the roof of the Joaneda House
4192
The Joaneda House fireplace and hearth
4193
Framing and pouring the loggia surface on the South side of the Joaneda House
4194
Framing and pouring the new floor surface in the interior of the Joaneda House
4195
Repairing window and door casements during the Joaneda House restoration
4196
Work on original walls during the Joaneda House restoration
4197
Details of the wall openings on either side of the chimney on the West façade
4198
Possible pieces of original wood salvaged from the Joaneda House
4199
Details of wood beams in situ
4200
Constructing a shed in the Southwest corner of the yard of the Joaneda House