|
|
![[1996-11] Water Budget Analysis for the Everglades Nutrient Removal Project (August 19, 1994 to August 19, 1996)](http://dpanther.fiu.edu/sobek/content/FI/12/09/04/42/00001/FI12090442thm.jpg) |
Water Budget Analysis for the Everglades Nutrient Removal Project (August 19, 1994 to August 19, 1996) |
|
|
[1996-11] Water Budget Analysis for the Everglades Nutrient Removal Project (August 19, 1994 to August 19, 1996) |
|
![[1998-03] Soil Moisture and Shallow Water Table Monitoring for Irrigation and Drainage Decision-Making](http://dpanther.fiu.edu/sobek/content/FI/12/09/04/45/00001/FI12090445thm.jpg) |
Soil Moisture and Shallow Water Table Monitoring for Irrigation and Drainage Decision-Making |
|
|
[1998-03] Soil Moisture and Shallow Water Table Monitoring for Irrigation and Drainage Decision-Making |
|
|
![[1998-07] Hydrologic performance of an Everglades stormwater treatment Area-STA6: a constructed wetland](http://dpanther.fiu.edu/sobek/content/FI/12/09/04/57/00001/FI12090457thm.jpg) |
Hydrologic performance of an Everglades stormwater treatment Area-STA6: a constructed wetland |
|
|
[1998-07] Hydrologic performance of an Everglades stormwater treatment Area-STA6: a constructed wetland |
|
![[1998-08] Statistical modeling of dry deposition phosphorus rates measured from South Florida](http://dpanther.fiu.edu/sobek/content/FI/12/09/04/61/00001/FI12090461thm.jpg) |
Statistical modeling of dry deposition phosphorus rates measured from South Florida |
|
|
[1998-08] Statistical modeling of dry deposition phosphorus rates measured from South Florida |
|
|
![[1998-09] Evapotranspiration Estimations for Wetland and Shallow Open-Water Systems in South Florida: Documentation for C Program etcalcs](http://dpanther.fiu.edu/sobek/content/FI/12/09/04/62/00001/FI12090462thm.jpg) |
Evapotranspiration Estimations for Wetland and Shallow Open-Water Systems in South Florida: Documentation for C Program etcalcs |
|
|
[1998-09] Evapotranspiration Estimations for Wetland and Shallow Open-Water Systems in South Florida: Documentation for C Program etcalcs |
|
![[1998-11] Water Budget Analysis for the Everglades Nutrient Removal Project (August 20, 1997 to August 19, 1998)](http://dpanther.fiu.edu/sobek/content/FI/12/09/04/63/00001/FI12090463thm.jpg) |
Water Budget Analysis for the Everglades Nutrient Removal Project (August 20, 1997 to August 19, 1998) |
|
|
[1998-11] Water Budget Analysis for the Everglades Nutrient Removal Project (August 20, 1997 to August 19, 1998) |
|
|
![[1999-04] Outlier detection in total phosphorus concentration data from South Florida rainfall](http://dpanther.fiu.edu/sobek/content/FI/12/09/04/54/00001/FI12090454thm.jpg) |
Outlier detection in total phosphorus concentration data from South Florida rainfall |
|
|
[1999-04] Outlier detection in total phosphorus concentration data from South Florida rainfall |
|
![[1999-09] Variability, uncertainty, and sensitivity of phosphorus deposition load estimates in South Florida](http://dpanther.fiu.edu/sobek/content/FI/12/09/04/69/00001/FI12090469thm.jpg) |
Variability, uncertainty, and sensitivity of phosphorus deposition load estimates in South Florida |
|
|
[1999-09] Variability, uncertainty, and sensitivity of phosphorus deposition load estimates in South Florida |
|
|
![[2000-12] Water Budget Analysis for the Everglades Nutrient Removal Project, and Stormwater Treatment Area 1 West (August 20, 1998 to August 30, 2000)](http://dpanther.fiu.edu/sobek/content/FI/12/09/03/31/00001/FI12090331thm.jpg) |
Water Budget Analysis for the Everglades Nutrient Removal Project, and Stormwater Treatment Area 1 West (August 20, 1998 to August 30, 2000) |
|
|
[2000-12] Water Budget Analysis for the Everglades Nutrient Removal Project, and Stormwater Treatment Area 1 West (August 20, 1998 to August 30, 2000) |
|
![[2001-02] Exploring the dynamics and fate of total phosphorus in the Florida Everglades using a calibrated mass balance model](http://dpanther.fiu.edu/sobek/content/FI/12/09/03/40/00001/FI12090340thm.jpg) |
Exploring the dynamics and fate of total phosphorus in the Florida Everglades using a calibrated mass balance model |
|
|
[2001-02] Exploring the dynamics and fate of total phosphorus in the Florida Everglades using a calibrated mass balance model |
|
|
![[2001-04] Hydrologic Performance of a Large-Scale Constructed Wetland: The Everglades Nutrient Removal Project](http://dpanther.fiu.edu/sobek/content/FI/12/09/03/37/00001/FI12090337thm.jpg) |
Hydrologic Performance of a Large-Scale Constructed Wetland: The Everglades Nutrient Removal Project |
|
|
[2001-04] Hydrologic Performance of a Large-Scale Constructed Wetland: The Everglades Nutrient Removal Project |
|
![[2001-05] Groundwater-Surface Water Interaction in Tree Islands: Water Conservation Area 3 Part 1: Phase 1 Well Installation](http://dpanther.fiu.edu/sobek/content/FI/12/09/04/82/00001/FI12090482thm.jpg) |
Groundwater-Surface Water Interaction in Tree Islands: Water Conservation Area 3 Part 1: Phase 1 Well Installation |
|
|
[2001-05] Groundwater-Surface Water Interaction in Tree Islands: Water Conservation Area 3 Part 1: Phase 1 Well Installation |
|
|
![[2001-07] Mercury Concentrations in Fish from Treatment Wetlands in the Northern Everglades](http://dpanther.fiu.edu/sobek/content/FI/12/09/03/38/00001/FI12090338thm.jpg) |
Mercury Concentrations in Fish from Treatment Wetlands in the Northern Everglades |
|
|
[2001-07] Mercury Concentrations in Fish from Treatment Wetlands in the Northern Everglades |
|
![[2001-11] Water Budget Analysis for Stormwater Treatment Area 1 West (July 1, 2000 to June 30, 2001)](http://dpanther.fiu.edu/sobek/content/FI/12/09/03/41/00001/FI12090341thm.jpg) |
Water Budget Analysis for Stormwater Treatment Area 1 West (July 1, 2000 to June 30, 2001) |
|
|
[2001-11] Water Budget Analysis for Stormwater Treatment Area 1 West (July 1, 2000 to June 30, 2001) |
|
|
![[2001-12] Flow monitoring in Stormwater Treatment Area No. 6](http://dpanther.fiu.edu/sobek/content/FI/12/09/03/42/00001/FI12090342thm.jpg) |
Flow monitoring in Stormwater Treatment Area No. 6 |
|
|
[2001-12] Flow monitoring in Stormwater Treatment Area No. 6 |
|
![[2002-01] Droughts and Water-Shortages in the Humid Region of Central and South Florida](http://dpanther.fiu.edu/sobek/content/FI/12/09/03/43/00001/FI12090343thm.jpg) |
Droughts and Water-Shortages in the Humid Region of Central and South Florida |
|
|
[2002-01] Droughts and Water-Shortages in the Humid Region of Central and South Florida |
|
|
![[2002] Evaluation of Preservation Methods for Nutrient Species Collected by Automatic Samplers](http://dpanther.fiu.edu/sobek/content/FI/12/09/03/36/00001/FI12090336thm.jpg) |
Evaluation of Preservation Methods for Nutrient Species Collected by Automatic Samplers |
|
|
[2002] Evaluation of Preservation Methods for Nutrient Species Collected by Automatic Samplers |
|
![[2002-02] Water Budget Analysis for Stormwater Treatment Area 5 (October 1, 1999 to April 30, 2001)](http://dpanther.fiu.edu/sobek/content/FI/12/09/03/45/00001/FI12090345thm.jpg) |
Water Budget Analysis for Stormwater Treatment Area 5 (October 1, 1999 to April 30, 2001) |
|
|
[2002-02] Water Budget Analysis for Stormwater Treatment Area 5 (October 1, 1999 to April 30, 2001) |
|
|
![[2002-02] Investigation of Surface Water-Groundwater Interactions at S-7 Pump Station](http://dpanther.fiu.edu/sobek/content/FI/12/09/04/89/00001/FI12090489thm.jpg) |
Investigation of Surface Water-Groundwater Interactions at S-7 Pump Station |
|
|
[2002-02] Investigation of Surface Water-Groundwater Interactions at S-7 Pump Station |
|
![[2002-03] Ground Water Monitor Well Network Assessment A District Task Force Report](http://dpanther.fiu.edu/sobek/content/FI/12/09/04/90/00001/FI12090490thm.jpg) |
Ground Water Monitor Well Network Assessment A District Task Force Report |
|
|
[2002-03] Ground Water Monitor Well Network Assessment A District Task Force Report |
|