|
No. |
Title |
Date |
|
1 |
Data collection, research and evaluation studies |
1991-09 |
|
2 |
Evaluating and Improving Flow Data Quality Using Strive Data at Water Control Structures |
2005-07 |
|
3 |
Flow Rating Analysis Procedures for Pumps |
2003-12 |
|
4 |
Flow Rating Development for New Pump Stations (S319, S361, S362, G370, G370S, G372, G372S, S25B, S26, G420, G420S, S332C, S356) |
2004-08 |
|
5 |
Groundwater-Surface Water Interaction in Tree Islands: Water Conservation Area 3 Part 1: Phase 1 Well Installation |
2001-05 |
|
6 |
Hydrologic characteristics of the Kissimmee River floodplain Boney Marsh experimental area |
1988-09 |
|
7 |
Monitoring and Operating Plan for C-111 Interim Construction Project |
1990-05 |
|
8 |
Nicodemus Slough/C-19 Project Conceptual Design Report |
1986-07 |
|
9 |
Performance of District Structures During Critical Storm Events in West Miami, and Proposed Alternatives to Reduce Flooding |
1982-10 |
|
10 |
Pollution Control Aspects of Water Management |
1971 |
|
11 |
Quantifying and Communicating Pumped Storm Water Flows for Real-Time Flood Management |
2005-07 |
|
12 |
Rating Analysis for Pump Station (S140, S331, S6, S7, S8) |
2006-02 |
|
13 |
Rating Analysis for Pump Station G310 |
2004-03 |
|
14 |
Rating Analysis for Pump Station S13 |
2004-05 |
|
15 |
Rating Analysis for Pump Station S13 |
2009-09 |
|
16 |
Rating Analysis for Pump Station S2 |
2007-06 |
|
17 |
Report of 1995 Wet Season Hydrologic Conditions |
1995 |
|
18 |
Review of Pre-Development Runoff Analysis Methods |
1989-04 |
|
19 |
S-13A Structure Improvements and Hydraulic Design |
|
|
20 |
Storm event of October 8-10, 1991 |
1991-12 |
|
|