No. Title Date
1 Upland Detention/Retention Demonstration Project: Third Annual Report to the Coordinating Council on the Restoration of the Kissimmee River Valley and Taylor Creek/Nubbin Slough Basin 1981-07
2 Upland Detention/Retention Demonstration Project; Fourth Annual Report to the Coordinating Council on the Restoration of the Kissimmee River Valley and Taylor Creek/Nubbin Slough Basin 1982-12
3 Everglades Nutrient Removal Project Dye Tracer Study 1994-10
4 Literature Review on the Effects of Groundwater Drawdowns on Isolated Wetlands 1995-11
5 The functionality of Melaleuca-dominated wetlands in South Florida 1996-04
6 Hydrologic performance of an Everglades stormwater treatment Area-STA6: a constructed wetland 1998-07
7 Evapotranspiration Estimations for Wetland and Shallow Open-Water Systems in South Florida: Documentation for C Program etcalcs 1998-09
8 Pond Apple Slough : Preliminary Assessment and Rehydration Test 2001-12
9 Stormwater Treatment Areas: Constructed Wetlands for Phosphorus Removal in South Florida Surface Waters 2004
10 Literature Review and Assessment of Geologic Logs to Determine the Extent of a Dense Limestone Layer in the Upper Portion of the Biscayne Aquifer in the Pennusuco Wetlands, Miami-Dade County, Florida 2005-12