No. Title Date
1 Constructed wetlands for water quality improvement in surface water discharges to the Everglades: Stormwater Treatment Areas
2 Water budget analysis for Stormwater Treatment Area 1 W (May 1, 2002 to April 30, 2003)
3 Report on Investigation of Back-Pumping Reversal and Alternative Water Retention Sites Miami Canal and North New River Canal Basins, Everglades Agricultural Area
4 Hydrologic aspects of on-site retention systems for urban storm runoff 1975
5 Effect of urban stormwater runoff to a man-made lake on groundwater quality 1980-05
6 Performance of District Structures During Critical Storm Events in West Miami, and Proposed Alternatives to Reduce Flooding 1982-10
7 An assessment of urban land use/stormwater runoff quality relationships and treatment efficiencies of selected stormwater management systems 1988-07
8 Peak Runoff Estimation from Undeveloped Lands 1989-03
9 Review of Pre-Development Runoff Analysis Methods 1989-04
10 Storm event of October 8-10, 1991 1991-12
11 Proceedings of the 4th Biennial Stormwater Research Conference : October 18-20, 1995, Clearwater Beach, Florida 1995-10
12 Application of SRPM to predict stormwater runoff and phosphorus loads 1996-05
13 Stormwater Runoff and Pollutant Model (SRPM) 1996-12
14 Flow-proportional sampling from variable flow canals 1997-07
15 Water Budget Analysis for Stormwater Treatment Area 6, section 1 2001-02
16 Water Budget Analysis for Stormwater Treatment Area 1 West (July 1, 2000 to June 30, 2001) 2001-11
17 Water Budget Analysis for Stormwater Treatment Area 5 (October 1, 1999 to April 30, 2001) 2002-02
18 Water Budget Analysis for Stormwater Treatment Area 1 West (July 1, 2001 to June 30, 2002) 2002-12
19 Water Budget Analysis for Stormwater Treatment Area 6, Section 1 (Water Years 98-99, 99-00, 00-01 and 01-02 - May 1, 1998 to April 30, 2002) 2003-01
20 Water Budget Analysis for Stormwater Treatment Area 5 2004-06