No. Title Date
1 Constructed wetlands for water quality improvement in surface water discharges to the Everglades: Stormwater Treatment Areas
2 Water budget analysis for Stormwater Treatment Area 1 W (May 1, 2002 to April 30, 2003)
3 Upland Detention/Retention Demonstration Project: Semi-Annual Report to the Coordinating Council on the Restoration of the Kissimmee River Valley and Taylor Creek/Nubbin Slough Basin 1980-01
4 Patterns of Radiophosphorus Accumulation in the Everglades After its Introduction into Surface Water 1982-02
5 Soil and surface water nutrients in the Everglades nutrient removal project 1991-12
6 Water Budget Analysis for the Everglades Nutrient Removal Project (August 19, 1994 to August 19, 1996) 1996-11
7 Water Budget Analysis for the Everglades Nutrient Removal Project 1997-11
8 Quantifying Atmospheric Deposition of Phosphorus: A Conceptual Model and Literature Review for Environmental Management 1998-03
9 Estimating the Mean and Variance of Censored Phosphorus Concentrations in Florida Rainfall 1998-06
10 Hydrologic performance of an Everglades stormwater treatment Area-STA6: a constructed wetland 1998-07
11 Evapotranspiration Estimations for Wetland and Shallow Open-Water Systems in South Florida: Documentation for C Program etcalcs 1998-09
12 Water Budget Analysis for the Everglades Nutrient Removal Project (August 20, 1997 to August 19, 1998) 1998-11
13 Statistical modeling of total phosphorus concentrations measured in south Florida rainfall 1999
14 Outlier detection in phosphorus dry deposition rates measured in South Florida 1999-02
15 Outlier detection in total phosphorus concentration data from South Florida rainfall 1999-04
16 Variability, uncertainty, and sensitivity of phosphorus deposition load estimates in South Florida 1999-09
17 Water Budget Analysis for the Everglades Nutrient Removal Project, and Stormwater Treatment Area 1 West (August 20, 1998 to August 30, 2000) 2000-12
18 Water Budget Analysis for Stormwater Treatment Area 6, section 1 2001-02
19 Exploring the dynamics and fate of total phosphorus in the Florida Everglades using a calibrated mass balance model 2001-02
20 Water Budget Analysis for Stormwater Treatment Area 1 West (July 1, 2000 to June 30, 2001) 2001-11