61
Water Budget Analysis for Stormwater Treatment Area 6, Section 1 (water years 2003 and 2004 ; May 1, 2002 to April 30, 2004)
62
Water Budget Analysis for Stormwater Treatment Area 5 (Water Year 2003-2004; May 1, 2003 to April 30, 2004)
63
Evaluating and Improving Flow Data Quality Using Strive Data at Water Control Structures
64
Preliminary analysis of a field-scale herbicide application of Aquathol K to control Hydrilla verticillata in Stormwater Treatment Area 2, Cell 3
65
Establishing a Baseline: Pre-Restoration Studies of the Channelized Kissimmee River
66
DEFINING SUCCESS: EXPECTATIONS FOR RESTORATION OF THE KISSIMMEE RIVER
67
Rating Development for Flow Through Culverts Under SR 9336 in the Everglades National Park III: Final Report
68
Everglades Nutrient Removal Project Test Cell Research: Optimizing Stormwater Treatment Area Performance - The Importance of Hydrologic Conditions in Maximizing Nutrient Retention by the STAs
69
Rating Analysis for Pump Station (S140, S331, S6, S7, S8)
70
Rating Analyses for Pump Statons (S140, S331, S6, S7, S8)
71
Water Budget Analysis for Stormwater Treatment Area 6, section 1 (Water Year 2005; May 1, 2004 through April 30, 2005)
72
Flow Rating Analysis for Pump Stations S-382 and S-383 Ten Mile Creek Water Preserve Area
73
Flow Rating Analysis for Pump Stations S-385 Nubbin Slough / New Palm Stormwater Treatment Area
74
Flow Rating Analysis for Pump Station CWPB2 M Canal/City of West Palm Beach
75
Flow Rating Analysis for Pump Station G388 STA % PSTA Outflow Pump Station
76
Flow Rating Analysis for Pump Station G349C Stormwater Treatment Area No 5
77
Water Budget Analysis for Stormwater Treatment Area 1 West (May 1, 2005 to April 30, 2006)
78
Flow Rating Analysis for Pump Station S-332C IOP Emergency Pump Station, C-111 Basin
79
Flow Rating Analysis for Pump Station S-390
80
Flow Rating Analysis for Pump Station G-207 and G-208 Brighton Seminole Indian Reservation