61
Environmental studies in the Chandler Slough watershed
62
Environmentl Response of WCA-2A to Reduction in Regulation Schedule and Marsh Drawdown
63
Estimating the Mean and Variance of Censored Phosphorus Concentrations in Florida Rainfall
64
Estuarine Water Quality Monitoring Network 1998 Annual Report
65
Evaluation of Preservation Methods for Nutrient Species Collected by Automatic Samplers
66
Evaluation of the water management system at a single family residential site.
67
Evaluation of the water management system at a single family residential site.
68
Evaluation report : a thirty day field experiment of water deliveries to northeast Shark River slough, April-May, 1984
69
Evapotranspiration estimation for South Florida
70
The Expert Assistance Program, 1993-1997
71
Exploring the dynamics and fate of total phosphorus in the Florida Everglades using a calibrated mass balance model
72
Field investigation into the feasibility of storing fresh water in saline portions of the Floridan aquifer system, St. Lucie County, Florida
73
Field testing of exfiltration systems
74
Floridan Aquifer system test well program at Lake Lytal Park, West Palm Beach, Florida
75
Floridan Aquifer System Test Well Program City of South Bay, Florida
76
Flow monitoring in Stormwater Treatment Area No. 6
77
Flow Rating Analysis for Pump Station CWPB2 M Canal/City of West Palm Beach
78
Flow Rating Analysis for Pump Station G-207 and G-208 Brighton Seminole Indian Reservation
79
Flow Rating Analysis for Pump Station G-337
80
Flow Rating Analysis for Pump Station G349C Stormwater Treatment Area No 5