21
Water Budget Analysis for the Everglades Nutrient Removal Project (August 19, 1994 to August 19, 1996)
22
Soil Moisture and Shallow Water Table Monitoring for Irrigation and Drainage Decision-Making
23
Hydrologic performance of an Everglades stormwater treatment Area-STA6: a constructed wetland
24
Statistical modeling of dry deposition phosphorus rates measured from South Florida
25
Evapotranspiration Estimations for Wetland and Shallow Open-Water Systems in South Florida: Documentation for C Program etcalcs
26
Water Budget Analysis for the Everglades Nutrient Removal Project (August 20, 1997 to August 19, 1998)
27
Outlier detection in total phosphorus concentration data from South Florida rainfall
28
Variability, uncertainty, and sensitivity of phosphorus deposition load estimates in South Florida
29
Water Budget Analysis for the Everglades Nutrient Removal Project, and Stormwater Treatment Area 1 West  (August 20, 1998 to August 30, 2000)
30
Exploring the dynamics and fate of total phosphorus in the Florida Everglades using a calibrated mass balance model
31
Hydrologic Performance of a Large-Scale Constructed Wetland: The Everglades Nutrient Removal Project
32
Groundwater-Surface Water Interaction in Tree Islands: Water Conservation Area 3 Part 1: Phase 1 Well Installation
33
Mercury Concentrations in Fish from Treatment Wetlands in the Northern Everglades
34
Water Budget Analysis for Stormwater Treatment Area 1 West (July 1, 2000 to June 30, 2001)
35
Flow monitoring in Stormwater Treatment Area No. 6
36
Droughts and Water-Shortages in the Humid Region of Central and South Florida
37
Evaluation of Preservation Methods for Nutrient Species Collected by Automatic Samplers
38
Water Budget Analysis for Stormwater Treatment Area 5 (October 1, 1999 to April 30, 2001)
39
Investigation of Surface Water-Groundwater Interactions at S-7 Pump Station
40
Ground Water Monitor Well Network Assessment A District Task Force Report