No. Title Date
81 Hydrologic Effects of the 1984 through 1986 L-31 Canal Drawdowns on the Northern Taylor Slough Basin of Everglades National Park 1988
82 A Two-Year Field Test of the Rainfall Plan: A Management Plan: Plan for Water Deliveries to Everglades National Park 1989-11
83 National Parks and Preserves of South Florida, vol. 6, no. 1 1993
84 Water Management in Taylor Slough and Effects on Florida Bay 1993-11
85 Effects of Hurricane Andrew on Natural and Archeological Resources 1996-09
86 Vegetation of Shark Slough, Everglades National Park 1997-04
87 Biscayne National Park Historic Resource Study 1998-01
88 Investigation of Surface Water-Groundwater Interactions at S-7 Pump Station 2002-02
89 Vegetation of coastal wetlands in Biscayne National Park: Blocks 6-8 2002-06-13
90 The L-31E Surface Water Rediversion Project Final Report: Implementation, Results, and Recommendations 2003-05-01
91 The promenade special area plan 2004-01
92 Cold war in South Florida : Historic resource study 2004-10
93 Everglades Water Quality 2005
94 As Assessment of the Interim Operational Plan 2005
95 Rating Development for Flow Through Culverts Under SR9336 in the Everglades National Park I: Concepts and Methods 2005-04
96 Rating Development for Flow Through Culverts Under SR9336 in the Everglades National Park II: Rating Calibration 2005-04
97 Rating Development for Flow Through Culverts Under SR 9336 in the Everglades National Park III: Final Report 2006-01
98 Rating Analyses for Pump Statons (S140, S331, S6, S7, S8) 2006-02
99 Ecological Targets for Western Biscayne National Park 2006-04
100 Flow Rating Analysis for Pump Stations S-382 and S-383 Ten Mile Creek Water Preserve Area 2006-10