Effects of mudseal slot deterioration on discharge through spillway structures S-70 and S-75 |
|
|
[1989-07] Effects of mudseal slot deterioration on discharge through spillway structures S-70 and S-75 |
|
|
AVHRR satellite monitoring of algal blooms and turbidity on Lake Okeechobee, Florida |
|
|
[1989-08] AVHRR satellite monitoring of algal blooms and turbidity on Lake Okeechobee, Florida |
|
|
|
|
[1989-09] Lake watch report, 1987 |
|
|
An atlas of the Everglades agricultural area surface water management basins |
|
|
[1989-09] An atlas of the Everglades agricultural area surface water management basins |
|
|
|
Analysis of the 1988-1989 drought |
|
|
[1989-10] Analysis of the 1988-1989 drought |
|
|
Analysis of the 1988-1989 drought |
|
|
[1989-10] Analysis of the 1988-1989 drought |
|
|
|
A Two-Year Field Test of the Rainfall Plan: A Management Plan: Plan for Water Deliveries to Everglades National Park |
|
|
[1989-11] A Two-Year Field Test of the Rainfall Plan: A Management Plan: Plan for Water Deliveries to Everglades National Park |
|
|
Ground water resource assessment of Eastern Palm Beach County, Florida |
|
|
[1989-12] Ground water resource assessment of Eastern Palm Beach County, Florida |
|
|
|
Lake watch report - 1988: The Status of Algal Blooms on Lake Okeechobee In 1988 |
|
|
[1989-12] Lake watch report - 1988: The Status of Algal Blooms on Lake Okeechobee In 1988 |
|
|
A Three-Dimensional Finite Difference Ground Water Flow Model of Lee County |
|
|
[1990-01] A Three-Dimensional Finite Difference Ground Water Flow Model of Lee County |
|
|
|
Southwest Broward / Northwest Dade subregional study - phase 2 : Executive summary |
|
|
[1990] Southwest Broward / Northwest Dade subregional study - phase 2 : Executive summary |
|
|
Generic quality assurance plan |
|
|
[1990-02] Generic quality assurance plan |
|
|
|
Application of DRASTIC ground water pollution mapping methodology to the SFWMD |
|
|
[1990-04] Application of DRASTIC ground water pollution mapping methodology to the SFWMD |
|
|
Monitoring and Operating Plan for C-111 Interim Construction Project |
|
|
[1990-05] Monitoring and Operating Plan for C-111 Interim Construction Project |
|
|
|
Lake Okeechobee water quality monitoring program |
|
|
[1990-06] Lake Okeechobee water quality monitoring program |
|
|
Analysis of the 1989-1990 drought |
|
|
[1990-09] Analysis of the 1989-1990 drought |
|
|
|
Growth, decomposition, and nutrient retention of sawgrass and cattail in the Everglades |
|
|
[1990-10] Growth, decomposition, and nutrient retention of sawgrass and cattail in the Everglades |
|
|
A Three-Dimensional Finite Difference Ground Water Flow Model of Hendry County |
|
|
[1990-10] A Three-Dimensional Finite Difference Ground Water Flow Model of Hendry County |
|
|
|
Frequency analysis of one and three-day rainfall maxima for central and southern Florida |
|
|
[1990-10] Frequency analysis of one and three-day rainfall maxima for central and southern Florida |
|
|
Herbicide monitoring program for N-Methylformamide and Fluridone [Sonar(R)] |
|
|
[1990-11] Herbicide monitoring program for N-Methylformamide and Fluridone [Sonar(R)] |
|