No. Title Date
1 Permittable Water use Estimates of the Floridan Aquifer System in the Upper East Coast Planning Area
2 An atlas of surface water management basins in the Everglades: THE WATER CONSERVATION AREAS AND EVERGLADES NATIONAL PARK
3 An approach to operation of a regional primary water control system 1971
4 Water management and environmental control in South Florida. 1972
5 Biological Investigations into the Condition of Several Caloosahatchee River Oxbows 1973-11
6 Water use and water supply development plan : (rough draft of part II) 1975
7 CLAD model and its applications 1979
8 Caloosahatchee River Oxbows: Environmental Inventory 1979-04
9 An analysis of water requirements and water demands for the South Florida Water Management District 1979-12
10 Shark Slough Water Level Correlation Analysis 1981-04
11 Management of water levels in the "frog pond" area, south Dade County, Florida 1981-10
12 Preliminary Environmental Responses to Marsh Dewatering and Reduction in Water Regulation Schedule in Water Conservation area-2A, November 1, 1980-December 31, 1981 1983-09
13 Mowry Canal (C-103): Water Quality and Discharge into Biscayne Bay, Florida, 1975-1981 1983-10
14 South Florida Water Management model documentation report 1983-12
15 The role of the South Florida Water Management District in growth management 1985-03
16 South Florida regional routing model 1986-06
17 A Routing Model for the Upper Kissimmee Chain of Lakes 1986-09
18 Martin County Water Resource Assessment 1987-05
19 Production Zones of Major Public Water Supply Wellfields for the Counties in the South Florida Water Management District 1988-04
20 Production Zones of Major Public Water Supply Wellfields for the Counties in the South Florida Water Management District 1988-04