No. Title Date
1 Estimation of rainfall for the Kissimmee River Basin. 1971
2 Report on progress of hydrologic, water quality and land use studies in the Kissimmee River Watershed and Lake Okeechobee 1974
3 Interdisciplinary models and optimization techniques used in water resources planning. 1975-06
4 Upland Detention/Retention Demonstration Project: Semi-Annual Report to the Coordinating Council on the Restoration of the Kissimmee River Valley and Taylor Creek/Nubbin Slough Basin 1980-01
5 Upland Detention/Retention Demonstration Project: Annual Report to the Coordinating Council on the Restoration of the Kissimmee River Valley and Taylor Creek/Nubbin Slough Basin 1980-07
6 Mineral Flux in the Boney Marsh, Kissimmee River : I. Mineral Retention in Relation to Overland Flow During the Three-year Period Following Reflooding 1981-03
7 Upland Detention/Retention Demonstration Project; Fourth Annual Report to the Coordinating Council on the Restoration of the Kissimmee River Valley and Taylor Creek/Nubbin Slough Basin 1982-12
8 Upland Detention/ Retention Demonstration Project Final Report 1986-03
9 Hydrologic characteristics of the Kissimmee River floodplain Boney Marsh experimental area 1988-09
10 Herbicide monitoring program for N-Methylformamide and Fluridone [Sonar(R)] 1990-11
11 Environmental responses to the Kissimmee River Demonstration Project 1991-03
12 An atlas of the lower Kissimmee River and Lake Istokpoga surface water management basins 1992-04
13 Hydrologic report of Lake Kissimmee Basin and preferred database development 1998-06
14 Hydrologic report on S65C and S65D sub-basins in the lower Kissimmee River water management basin 1999-06
15 Engineering/well completion report Floridan Aquifer System Test/Monitor Well ORF-60 2004-11
16 Establishing a Baseline: Pre-Restoration Studies of the Channelized Kissimmee River 2005-11
17 DEFINING SUCCESS: EXPECTATIONS FOR RESTORATION OF THE KISSIMMEE RIVER 2005-11
18 CREAMS-WT calibration for the Upper Kissimmee Region 2009-04