No. Title Date
1 Correspondence relating to Arch Creek, Biscayne and Dade drainage districts 1924
2 Proposed final boundary, Everglades National Park, Florida 1957-04
3 A report on area B, Dade and Broward Counties: a part of the Central and Southern Florida Flood Control Project 1959
4 Improvement of the canal-aquifer flow regime in the C-1N Basin 1979-06
5 Water shortage planning and review team : county meetings, special interest meeting, general public meeting. 1981-09
6 Management of water levels in the "frog pond" area, south Dade County, Florida 1981-10
7 Annual report. 1983
8 Plant Communities of Water Conservation Area 3A : Base-Line Documentation Prior to the Operation of S-339 and S-340 1983-05
9 Preliminary Evaluation of Hydrologic Data Collected from the C-103 basin, Dade County, Florida 1985-06
10 Miami-Dade County Northwest Wellfield Groundwater Velocity Investigation 2001-01
11 Floridan aquifer system test well program L-30N Canal, Mimai-Dade, Florida 2003-12
12 Groundwater-surface water interaction along the C-2 Canal, Miami-Dade County, Florida 2008