No. Title Date
1 S-13A Structure Improvements and Hydraulic Design
2 New River (Broward County, Fla.), 1920-1928 1920/1928
3 Water Management Plan for the Western C-9 Basin. 1976-08
4 Effect of urban stormwater runoff to a man-made lake on groundwater quality 1980-05
5 Southwest Broward County study. 1982-10
6 A Potable Water Use Data Base for South Florida, 1980 1983-05
7 An atlas of eastern Broward County surface water management basins 1987-11
8 A Three-Dimensional Finite Difference Ground Water Flow Model of the Surficial Aquifer System, Broward County, Florida 1992-05
9 Pond Apple Slough : Preliminary Assessment and Rehydration Test 2001-12
10 Investigation of Surface Water-Groundwater Interactions at S-7 Pump Station 2002-02
11 Floridan aquifer system test well program C-13 canal, Oakland Park, Florida 2003-04
12 Rating Analysis for Pump Station S9 2003-07
13 Conservation Area Inflows and Outflows 2006-02
14 Hurricane effects on South Florida water management system : a case study of Hurricane Wilma of October 2005 2008-01