No. Title Date
1 Effect of hurricane Betsy on project salinity structures of the Central and Southern Florida Flood Control District. 1965
2 Environmental resources management studies of the Kissimmee River Basin : final report 1976
3 Evaluation of the West Palm Beach Canal watershed tributary to pumping station S-5A. 1973-06
4 Guideline for evaluation of irrigation use permits. 1975
5 Hydrologic reconnaissance of conservation areas one, two, and three of the Central and Southern Florida project final report to Central and Southern Florida Flood Control District 1971
6 Memorandum report on surface water availability in the Lake Istokpoga-Indian Prairie area 1974
7 Memorandum report on surface water availability in the St. Lucie County area. 1974
8 Pollution Control Aspects of Water Management 1971
9 Present and Projected Land Use Analysis of the Earman River Canal (C-17). 1968
10 Program of Lake Okeechobee investigations 1973
11 A report on area B, Dade and Broward Counties: a part of the Central and Southern Florida Flood Control Project 1959
12 Report to the Governing Board on Regulatory Levels for the Lakes of the Upper Kissimmee Basin 1995-02
13 Some aspects of the Hydrology of Conservation Area No. 3
14 Statement on the Kissimmee Basin Project presented to the Governor and Cabinet 1972
15 Water Management Plan for the Western C-9 Basin. 1976-08