No. Title Date
61 An atlas of eastern Dade County surface water management basins 1987-10
62 An atlas of eastern Palm Beach County surface water management basins 1988-06
63 An atlas of Martin County surface water management basins 1988-11
64 An atlas of St. Lucie County surface water management basins 1988-11
65 An atlas of surface water management basins in the Everglades: THE WATER CONSERVATION AREAS AND EVERGLADES NATIONAL PARK
66 An atlas of the Everglades agricultural area surface water management basins 1989-09
67 An atlas of the lower Kissimmee River and Lake Istokpoga surface water management basins 1992-04
68 An atlas of the upper Kissimmee surface water management basins 1992-02
69 An evaluation of wastewater reuse policy options for the South Florida Water Management District 1984-04
70 An Integrated Surface Water Quality Monitoring Program for South Florida Coastal Waters 1999-01-01
71 An Integrated Surface Water Quality Monitoring Program for the South Florida Coastal Waters FY 2000 Annual Report 2000-01-01
72 An Integrated Surface Water Quality Monitoring Program for the South Florida Coastal Waters FY 2001 Cumulative Report to the South Florida Water Management District 2001-01-01
73 An Integrated Surface Water Quality Monitoring Program for the South Florida Coastal Waters FY2002 Cumulative Report to the South Florida Water Management District (Contract No. 10244- A2) 2002-01-01
74 An operational watershed model : general considerations, purposes, and progress 1971
75 An operational watershed model : step 1-B; regulation of water levels in the Kissimmee River Basin 1969
76 Analysis of the 1988-1989 drought 1989-10
77 Analysis of the 1988-1989 drought 1989-10
78 Analysis of the 1989-1990 drought 1990-09
79 Anhinga Trail, Everglades National Park, Florida Gateway to Everglades National Park
80 Anhinga trail in the Everglades 1955