No. Title Date
221 Taylor Slough C-11 1980-02
222 Taylor Slough L-31 (W) South of S-332 1980-06
223 Taylor Slough S-32 construction 1979-12
224 Taylor Slough S-32 construction 1979-12
225 Taylor Slough S-32 construction 1979-12
226 Taylor Slough S-32 construction 1980-01
227 Taylor Slough S-32 construction 1980-06
228 Tree Islands in Everglades Landscapes: Current Status, Historical Changes, and Hydrologic Impacts on Population Dynamics and Moisture Relations, First Annual Report 2005-12-30
229 Tropical Hardwood Hammocks of the Interior of Everglades National Park and Big Cypress National Preserve 1980-11
230 Twenty-nine Year Synopsis of the Coot Bay Christmas Bird Count 1980-12
231 A Two-Year Field Test of the Rainfall Plan: A Management Plan: Plan for Water Deliveries to Everglades National Park 1989-11
232 Skip Navigation Links.
233 Use of tritium and helium to define groundwater flow conditions in Everglades National Park 2003
234 Vegetation Cover Types of Shark River Slough, Everglades National Park Derived from LANDSAT Thematic Mapper Data 1986-01
235 Vegetation Map of the Coastal Region Between flamingo and Joe Bay of Everglades National Park 1980
236 Vegetation of coastal wetlands in Biscayne National Park: Blocks 6-8 2002-06-13
237 The Vegetation of Long Pine Key, Everglades National Park 1983-08
238 Vegetation of Shark Slough, Everglades National Park 1997-04
239 Vegetation of the Southern Coastal Region of Everglades National Park Between Flamingo and Joe Bay 1981-04
240 Visitor Guide: National Parks and Preserves of South Florida, vol. 6, no. 1 1994