No. Title Date
1 Miami Beach between 1919 and 1934 1919/1934
2 Rosie the elephant at work 1922
3 Laying street car tracks along Alton Road at about Thirty-fifth Street 1923
4 Aerial view looking west from Meridian Avenue and Lincoln Road. 1923
5 Filling the polo fields; the Nautilus Hotel under construction in the distance 1923
6 Horses, mules, elephants, and machines used by Carl G. Fisher to develop much of Miami Beach, 1923 1925
7 Carl G. Fisher employee card 1926
8 Miami Beach City Engineer Ed. R. Neff's Letters 1926
9 City Engineer's letters and notes after the 1926 hurricane in Miami Beach 1926
10 Meyer-Kiser building at 139 NE 1st Street under construction 1926