1081
South Jetty Bakers Haulover
1082
Hollywood Beach
1083
Eroded steel groyne: also breakwater at Palm Beach
1084
Concrete seawall failure at Bakers Halouver: also improved property to the south on deep lots
1085
Breach in groyne near outer end at Miami Beach
1086
Steel groyne with concrete encasement to sand abrasion at Palm Beach
1087
Breach at groyne end Miami Beach
1088
Hollywood Beach Hotel
1089
Failure of wing braced groyne at Miami Beach
1090
Wing braced groyne at Miami Beach
1091
Creosoted timber deterioration in 20-year old groyne Miami Beach
1092
20-year old groyne at Miami Beach
1093
Black and white photograph of a wooden bulkhead failure at Palm Beach.
1094
Concrete walk on steel groyne at Miami Beach
1095
Year old installation at Martinique Hotel Miami Beach
1096
Steel bulkhead with concrete coping at Miami Beach
1097
Ocean front at 37th St Miami Beach
1098
Ocean front at 26th street Miami Beach
1099
View of ocean front
1100
Ocean front at 26th street Miami Beach