No. Title Date
301 Crane building a sea-wall 1923
302 Norman Davis suction dredge 1923
303 Dredge making ready for a sea-wall 1923
304 Bulkhead of a Venetian Island 1923
305 Land ready to fill, just north of the Nautilus Hotel site 1923
306 Dredge outlet filling polo grounds 1923
307 Rosie the elephant 1923
308 Clearing palmetto north of Dade Boulevard in the neighborhood of Prairie Avenue 1923
309 Close-up of hydraulic leveling 1923
310 Filling the polo fields; the Nautilus Hotel under construction in the distance 1923
311 Laying street car tracks along Alton Road at about Thirty-fifth Street 1923
312 Aerial view looking west from Meridian Avenue and Lincoln Road. 1923
313 Piling palmetto roots to be dried and burned 1923
314 Search warrants and building violations,1920s 1923
315 Shrine Parade and hotels 1923
316 Ordinance 187: City of Miami Beach 1923-02-21
317 Ordinance 189: City of Miami Beach 1923-04-04
318 Ordinance 190: City of Miami Beach 1923-04-18
319 Ordinance 191: City of Miami Beach 1923-04-18
320 Ordinance 192: City of Miami Beach 1923-04-18