No. Title Date
1 Water budget analysis for Stormwater Treatment Area 1 W (May 1, 2002 to April 30, 2003)
2 1990 Annual report for the Nicodemus Slough Mitigation/Monitoring Project 1991-02
3 Ambient Pesticide Monitoring Network: 1992 to 2007 2009-10
4 Arch Creek Restoration Project, 1992 1992
5 C-51 West sub-basin Updated analysis of flow and phosphorus data 2005-06
6 Constructed wetlands for water quality improvement in surface water discharges to the Everglades: Stormwater Treatment Areas
7 DEFINING SUCCESS: EXPECTATIONS FOR RESTORATION OF THE KISSIMMEE RIVER 2005-11
8 Skip Navigation Links.
9 Draft: Evaluation of Benefits and Impacts of the Hydropattern Restoration Components of the Everglades Construction Project 1996-08-16
10 Skip Navigation Links.
11 Engineering/well completion report Floridan Aquifer System Test/Monitor Well ORF-60 2004-11
12 Environmental responses to the Kissimmee River Demonstration Project 1991-03
13 Establishing a Baseline: Pre-Restoration Studies of the Channelized Kissimmee River 2005-11
14 Evaluation of Preservation Methods for Nutrient Species Collected by Automatic Samplers 2002
15 Everglades Nutrient Removal Project Dye Tracer Study 1994-10
16 Everglades Nutrient Removal Project Test Cell Research: Optimizing Stormwater Treatment Area Performance - The Importance of Hydrologic Conditions in Maximizing Nutrient Retention by the STAs 2006-01
17 First Annual Conference of the The Walt Dineen Society 1997
18 Flow monitoring in Stormwater Treatment Area No. 6 2001-12
19 Guy Forchion Memo to the Virginia Key Beach park Trust's Planning and Construction and Nature and Environment Committees 2006-02-15
20 Hole-in-the-Donut Restoration Collection 1996-04-01