No. Title Date
1 Water budget analysis for Stormwater Treatment Area 1 W (May 1, 2002 to April 30, 2003)
2 Constructed wetlands for water quality improvement in surface water discharges to the Everglades: Stormwater Treatment Areas
3 Plant List for the Coastal Dune Construction Project
4 Photos of the potential walking trail at Virginia Key Beach Park
5 Virginia Key Beach Park's Application for the NOAA's Coastal and Marine Habitation Restoration Grant
6 Virginia Key Beach Park's Expanded Application for the NOAA's Coastal and Marine Habitation Restoration Grant
7 Virginia Key Beach Park Trust's Estimated Timeline for the Projects Listed in their NOAA Application
8 Budget Justification for Restoring Coastal Miami
9 Project Summary for the Virginia Key Beach Restoration Project
10 Aerial Photo of the NOAA Stimulus Grant Design Map
11 Virginia Key Beach Park Trust's Draft Application for the NOAA Stimulus Grant
12 NOAA Monitoring Plan in Support of the Virginia Key Restoration Project
13 Map of the Virginia Key Areas Considered for Restoration
14 Report of the special study team on the Florida Everglades George W. Cornwell ... [et al.]. 1970
15 Nicodemus Slough/C-19 Project Conceptual Design Report 1986-07
16 1990 Annual report for the Nicodemus Slough Mitigation/Monitoring Project 1991-02
17 Environmental responses to the Kissimmee River Demonstration Project 1991-03
18 Arch Creek Restoration Project, 1992 1992
19 Everglades Nutrient Removal Project Dye Tracer Study 1994-10
20 Hole-in-the-Donut Restoration Collection 1996-04-01