No. Title Date
1 S-13A Structure Improvements and Hydraulic Design
2 Flooded building 1910
3 Flooded farmland 1947
4 Flooded farmland 1947
5 Flooded farmland 1948
6 A report on area B, Dade and Broward Counties: a part of the Central and Southern Florida Flood Control Project 1959
7 Some environmental effects of drainage in Florida 1968
8 Pollution Control Aspects of Water Management 1971
9 Operational analysis of a flood in the lower Kissimmee River basin 1971
10 An approach to operation of a regional primary water control system 1971
11 Statement on the Kissimmee Basin Project presented to the Governor and Cabinet 1972
12 Water management and environmental control in South Florida. 1972
13 Impact of upland marsh on water quality 1974
14 Agricultural reservoir study 1975
15 Performance of District Structures During Critical Storm Events in West Miami, and Proposed Alternatives to Reduce Flooding 1982-10
16 County Beach after Hurricane Kate 1985
17 A wet season field test of experimental water deliveries to northeast Shark River slough, August-November, 1984 1985-07
18 A wet season field test of experimental water deliveries to northeast Shark River slough, August-November, 1984 1985-09
19 Nicodemus Slough/C-19 Project Conceptual Design Report 1986-07
20 Hydrologic characteristics of the Kissimmee River floodplain Boney Marsh experimental area 1988-09